Clywedog Dam

Operator :
Severn Trent Water
Address :
Clywedog Dam
Llanidloes
Powys
Wales
SY18 6NU
Capacity :
714 kW
Commissioned :
1967
Details :
Construction of the massive damming work on the river Clywedog dam above Llanidloes was a joint venture evolving both Severn Trent Water and Bristol Water it started in 1964, completed in 1967. There are 2 Francis turbines, flow is used to regulate the river.

Back to installations

SPONSORS:

Infinis Gilkes Hydroplan RWE npower renewables